|
|
(6 intermediate revisions by 3 users not shown) |
Line 1: |
Line 1: |
− | == Electrical ==
| + | #REDIRECT [[Utilities]] |
− | There are two meters for the floor; there previously had been two tenants. As of August 2009, the rear meter is on (we are not sure who is paying for this) but the front meter is off.
| |
− | | |
− | We have a new PG&E account for 2169 Mission (could not transfer the 83C account b/c it was residential ?!?)
| |
− | | |
− | * account number: 0597139732-7
| |
− | * rear meter is under our account as of 9-29-09
| |
− | * front meter will be turned on on Monday 10-5-09 between 1PM and 5PM, billed on the same account
| |
− | * service level for both meters is 'small': A-1
| |
− | * if we go over 4200 kWh per month consistently, we should upgrade to the 'medium' rate, A-10
| |
− | * we're still e-billed, I am pretty sure
| |
− | * the billing address is our non-PO Box (see above)
| |
− | | |
− | == Garbage ==
| |
− | * provider: Sunset Scavenger
| |
− | * phone: 415-330-1300
| |
− | * account: 514993762
| |
− | * pickup day: Tuesday
| |
− | * garbage bin: one 64 gallon (black)
| |
− | * recycling bin: one 64 gallon (blue)
| |
− | * monthly cost: $91.88
| |
− | * start date: 2009-08-18, got larger garbage bin on 2009-09-25
| |