=== First Floor ===
=== First Floor ===


Note: Drawings below are too scale, there is a rendering error in the PNG converter, click on images to see full original SVG.
==== Entrance ====


TODO:
*Install Electromagnetic Lock
*Install push to exit button(s)
*Install exterior RFID/NFC reader
*Install automatic door opener
There is a exterior 3' wide metal framed door as the main entrance to the space. It had been modified to only open inwards although the hinge mechanism is designed to swing both ways. There is a hydraulic damper that seems to have leaked all its fluid and is not functional.
[[User:Ⅹ|Ⅹ]] ([[User talk:Ⅹ|talk]]) 23:14, 26 September 2020 (UTC) re-modified the door so it only opens outwards in an effort towards future Safety and ADA compliance, the door will be able to be pushed open from the inside. This will also facilitate a mag lock mechanism that can be remotely actuated with a door opener.
The door latch mechanism is missing a lower mount bracket, however with the addition of the mag lock, this will no longer be functionally used.
[https://smile.amazon.com/QWORK-Holding-Electromagnetic-Magnetic-Mounting/dp/B086D8FXB6 Electromagnetic Door Lock]
Note: Drawings below are to scale, there is a rendering error in the PNG converter, click on images to see full original SVG.
==== Front ====
[[File:Front.png|1058|Outdoor area in front of Noisebridge]]
Ground floor driveway area between Capp Street and building entrance. Source: [https://noisebridge.net/File:Front.svg]
==== 'Turing' ====


[[File:Turing.svg]]
[[File:Turing.svg]]
Line 20: Line 45:




==== 'Bunker' ====
[[File:Bunker.svg]]
[[File:Bunker.svg]]


Line 25: Line 51:




==== 'Dumper' ====
[[File:Dumper.svg|990]]
[[File:Dumper.svg|990]]


Scale drawing of ground floor bathroom at back of building.
Scale drawing of ground floor bathroom at back of building.


=== Second Floor ===


=== Second Floor ===
[[File:Zero.png|1056]]
 
Scale drawing (1 square per foot) of open space nearest Capp St. on 2nd Floor.


[[File:One.png|1056]]
[[File:One.png|1056]]
Line 45: Line 75:


Scale drawing (1 square per foot) of room furthest from Capp St. on 2nd Floor.
Scale drawing (1 square per foot) of room furthest from Capp St. on 2nd Floor.
==Pyconaut Blender model images==
[[File:Noisebridge_272_first_floor_unmodified.png|1000px]]
[[File:Noisebridge_272_second_floor_unmodified.png|1000px]]
[[File:Noisebridge_272_first_floor_modified.png|1000px]]
[[File:Noisebridge_272_second_floor_modified.png|1000px]]





Revision as of 20:37, 22 November 2020

Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | 5MoF | Meetings | Donate | (Edit)
About | Vision | 272 Capp | Materials | Testimonials | Lore | Photos | Hackerspaces | 501c3 | Press | Press Kit | Zine | Help | (Edit)
Lore | Oral histories | History | Anarchy | 83c | 2169 | 272 Capp | Anniversaries | Rebase | Reboot | Humanitarian | Kitchen | Drama | (Edit)

272 Capp St. is the third location of Noisebridge we are moving to.

  • It is right across from Noisebridge. You can see it from the back kitchen windows in Noisebridge.
  • It is 2 floors, 6000sq/ft total.
  • It is on the ground floor, has a roll up door, and parking

Space

First Floor

Entrance

TODO:

  • Install Electromagnetic Lock
  • Install push to exit button(s)
  • Install exterior RFID/NFC reader
  • Install automatic door opener

There is a exterior 3' wide metal framed door as the main entrance to the space. It had been modified to only open inwards although the hinge mechanism is designed to swing both ways. There is a hydraulic damper that seems to have leaked all its fluid and is not functional.

(talk) 23:14, 26 September 2020 (UTC) re-modified the door so it only opens outwards in an effort towards future Safety and ADA compliance, the door will be able to be pushed open from the inside. This will also facilitate a mag lock mechanism that can be remotely actuated with a door opener.

The door latch mechanism is missing a lower mount bracket, however with the addition of the mag lock, this will no longer be functionally used.


Electromagnetic Door Lock


Note: Drawings below are to scale, there is a rendering error in the PNG converter, click on images to see full original SVG.

Front

Outdoor area in front of Noisebridge

Ground floor driveway area between Capp Street and building entrance. Source: [1]


'Turing'

Turing.svg

Scale drawing of ground floor room on Capp St. end of building.


'Bunker'

Bunker.svg

Scale drawing of ground floor in Northwest corner of building.


'Dumper'

990

Scale drawing of ground floor bathroom at back of building.

Second Floor

1056

Scale drawing (1 square per foot) of open space nearest Capp St. on 2nd Floor.

1056

Scale drawing (1 square per foot) of room nearest Capp St. on 2nd Floor.


1054

Scale drawing (1 square per foot) of middle room on 2nd Floor.


1056

Scale drawing (1 square per foot) of room furthest from Capp St. on 2nd Floor.


Pyconaut Blender model images