Elevator: Difference between revisions
Jump to navigation
Jump to search
m (finesse ... fin!) |
No edit summary |
||
(81 intermediate revisions by 10 users not shown) | |||
Line 1: | Line 1: | ||
{{272}} | |||
{{blackbox}}[[File:Proposedelevator.jpg|right|200px]] You are standing at the location of a future elevator construction project proposed to be built at the [[Front]] leading [[Upstairs]]. | |||
'''EXITS:''' [[Upstairs]], [[Front]] | |||
{{cursorboxend}} | |||
= 272 Capp St. Elevator Construction Project = | |||
[[Accessibility]] guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment. | |||
* Details will go here as they develop. | |||
* It fits into the larger [[272]] buildout plan. | |||
===Proposed Locations=== | |||
*In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]] | |||
=Proposed Elevator Types= | |||
==Hercules II== | |||
A small lift capable of taking wheelchairs and equipment between floors. | |||
[[File: | [https://www.ameriglide.com/item/AmeriGlide-Hercules-II-Hybrid-Residential-Commercial.html AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift] $11,000 | ||
This is what the Hercules II elevator could look like: | |||
[[File:Proposedelevator.jpg]] | |||
{{construction}} | |||
{{proposal}} | |||
=History= | |||
*[[2169/Elevator]] |
Latest revision as of 08:42, 5 January 2022
Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | 5MoF | Meetings | Donate | (Edit) |
272 Capp St. | Layout | Parking | Fence | Access | Patio | Entrance | Front | Hackitorium | Stage | Lockers | Stairs | Upstairs | Classrooms | Exits | Roll up door | Bathrooms | Network | Roof | Audio | AV | Construction | Electrical | Print Shop | Elevator | Back hall | Back patio | Fire escape | Plants | Sustenance | Housekeeping | (Edit) |
You are standing at the location of a future elevator construction project proposed to be built at the Front leading Upstairs. |
272 Capp St. Elevator Construction Project[edit]
Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.
- Details will go here as they develop.
- It fits into the larger 272 buildout plan.
Proposed Locations[edit]
- In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen
Proposed Elevator Types[edit]
Hercules II[edit]
A small lift capable of taking wheelchairs and equipment between floors.
AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000
This is what the Hercules II elevator could look like:
UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit |
Proposals to improve Noisebridge. Edit |