Elevator: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
m (finesse ... fin!)
No edit summary
 
(81 intermediate revisions by 10 users not shown)
Line 1: Line 1:
Use the [[Elevator_Buzzer|elevator buzzer]] if you need assistance, or if the call buttons do not work.
{{272}}
{{blackbox}}[[File:Proposedelevator.jpg|right|200px]] You are standing at the location of a future elevator construction project proposed to be built at the [[Front]] leading [[Upstairs]].


The elevator light fixture uses a [http://en.wikipedia.org/wiki/GU24_connector GU24 base] rather than a [http://en.wikipedia.org/wiki/Edison_screw "screw-in"] socket - it requires a 26 watt / GU24 base bulb (such as Eco-Stor model # P26SP-GU24/WW - about $6 + tax from [http://www.discountbuilderssupplysf.com/directions.php Discount Builder Supply] on 13th Street and Mission)
'''EXITS:''' [[Upstairs]], [[Front]]


Current Status:  call buttons operational, call light on first floor fixed (120V M5).  Whole system sometimes does not realize it is not in operation, at which time the call buttons do not work.  Only known fix for this is to get inside, ride it to another floor, and exit normally.  Sometimes you have to do this a couple times.
{{cursorboxend}}


'''July 27 2010 Test report:'''
= 272 Capp St. Elevator Construction Project =


1st floor call button normally closed contacts were impacted with nonconductive dirt.  Cleaning is performed with simple white paper, not anything else. Please, if you ever clean these call button relays do not use abrasives, they shorten the life of the relay. Also be sure to take voltage precautions since the switch has 120VAC across it.
[[Accessibility]] guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.  
* Details will go here as they develop.
* It fits into the larger [[272]] buildout plan.


When any call button doesn't work, the whole system doesn't work. Is that what is called 'failsafe'?
===Proposed Locations===
*In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]]


There's a PDF for an elevator test plan uploaded to the Noisebridge wiki for the elevator.  Test monthly.
=Proposed Elevator Types=
==Hercules II==
A small lift capable of taking wheelchairs and equipment between floors.


[[File:ElevatorTestplan.pdf]]
[https://www.ameriglide.com/item/AmeriGlide-Hercules-II-Hybrid-Residential-Commercial.html AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift] $11,000
 
This is what the Hercules II elevator could look like:
 
[[File:Proposedelevator.jpg]]
 
{{construction}}
{{proposal}}
=History=
*[[2169/Elevator]]

Latest revision as of 08:42, 5 January 2022

Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | 5MoF | Meetings | Donate | (Edit)
272 Capp St. | Layout | Parking | Fence | Access | Patio | Entrance | Front | Hackitorium | Stage | Lockers | Stairs | Upstairs | Classrooms | Exits | Roll up door | Bathrooms | Network | Roof | Audio | AV | Construction | Electrical | Print Shop | Elevator | Back hall | Back patio | Fire escape | Plants | Sustenance | Housekeeping | (Edit)
Proposedelevator.jpg
You are standing at the location of a future elevator construction project proposed to be built at the Front leading Upstairs.

EXITS: Upstairs, Front


> Blinkingcursor.gif

272 Capp St. Elevator Construction Project[edit]

Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.

  • Details will go here as they develop.
  • It fits into the larger 272 buildout plan.

Proposed Locations[edit]

  • In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen

Proposed Elevator Types[edit]

Hercules II[edit]

A small lift capable of taking wheelchairs and equipment between floors.

AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000

This is what the Hercules II elevator could look like:

Proposedelevator.jpg


UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit
Proposals to improve Noisebridge. Edit

History[edit]