Elevator

From Noisebridge
Revision as of 07:42, 5 January 2022 by Lxpk (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | WGs | 5MoF | Meetings | Donate V · T · E
272 Capp St. | Layout | Parking | Fence | Access | Patio | Entrance | Front | Hackitorium | Stage | Lockers | Stairs | Upstairs | Classrooms | Exits | Roll up door | Bathrooms | Network | Roof | Audio | AV | Construction | Electrical | Print Shop | Elevator | Back hall | Back patio | Fire escape | Plants | Sustenance | Housekeeping V · T · E
Proposedelevator.jpg
You are standing at the location of a future elevator construction project proposed to be built at the Front leading Upstairs.

EXITS: Upstairs, Front


> Blinkingcursor.gif

272 Capp St. Elevator Construction Project[edit | edit source]

Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.

  • Details will go here as they develop.
  • It fits into the larger 272 buildout plan.

Proposed Locations[edit | edit source]

  • In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen

Proposed Elevator Types[edit | edit source]

Hercules II[edit | edit source]

A small lift capable of taking wheelchairs and equipment between floors.

AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000

This is what the Hercules II elevator could look like:

Proposedelevator.jpg


UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit

Proposals to improve Noisebridge. Edit

History[edit | edit source]