Layout

From Noisebridge
Revision as of 10:50, 5 January 2022 by Lxpk (talk | contribs)
Jump to navigation Jump to search
Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | 5MoF | Meetings | Donate | (Edit)
272 Capp St. | Layout | Parking | Fence | Access | Patio | Entrance | Front | Hackitorium | Stage | Lockers | Stairs | Upstairs | Classrooms | Exits | Roll up door | Bathrooms | Network | Roof | Audio | AV | Construction | Electrical | Print Shop | Elevator | Back hall | Back patio | Fire escape | Plants | Sustenance | Housekeeping | (Edit)
Layout dec 23 2021.png

You are looking at The Layout Map of Noisebridge posted on the wall in the Entrance.

EXITS: Entrance

> Blinkingcursor.gif

The layout is always in flux but especially right now as we just moved into 272 and we are still figuring out where major items like the laser cutter and future elevator go to do electrical and construction work. Feel free to propose layout changes by modifying the floor plan or one of the existing layout images.

272 Layout

Dec 23 2021

Layout dec 23 2021.png

2169 Layout

83c Layout