Editing
Meeting Notes 2014 06 10
(section)
Jump to navigation
Jump to search
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Electrician's Report == THE ELECTRICIAN REPORTS! Tim says: * The inspector’s going to look for safety issues, code violations, etc. any work that’s been done without a permit which implies an inspection. You have a lot of all of those. * Neil [Tim's partner] did a lot of the original work in NB. * We did an initial assessment. Fixed the panel this past Thursday in the course of the assessment. Assessed the electrical loads. “Red flag” items (dangerous, unsafe, done illegally) — we have that list. What are the loads that are going to stay in the space? What do we have to do to keep them supplied with adequate power — we have a list of that stuff. * Need to work in the space over the course of 4-6 weeks to make a whole bunch of corrections. July-August. We’ll do a lot before the walkthrough (red flags plus things that were done w/o permit but need to be there so it doesn’t look weird) * Some stuff will look crazy to an inspector, e.g. the Laser cutter. (to be removed from the space for the inspections) Process: * get rid of the major red flags (late June) * get a “survey inspection”, who will comment on Must Dos from there. (line up for first week of July) * Tim recommends a complete overhaul of the space (tripping hazards, equipment in awkward places) * Panel at the top of the stairs. “real problem panel” / Must Fix. Both Neil and Tim will come to next Tuesday meeting with the detailed report. Other safety concerns -- inspections may trigger other inspections (e.g. fire safety). * Fire code requires fire escape egress. Needs to be lit and have emergency exit sign. * Ventilation issues (e.g. from solder. Maybe put all soldering irons in a locker…) * Check the plumbing in the kitchen and bathrooms. Networking: not so much a concern, just make it less floppy and try not to ziptie to conduit. We may be able to negotiate with the landlord on improvements to the space, if the electrical work touches on the building in general. Naomi will check with landlord about extending the lease, maybe getting cooperation on costs to fix up things that constitute improvements to the building.
Summary:
Please note that all contributions to Noisebridge are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike (see
Noisebridge:Copyrights
for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource.
Do not submit copyrighted work without permission!
To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:
Cancel
Editing help
(opens in new window)
Navigation menu
Personal tools
Not logged in
Talk
Contributions
Log in
Request account
Namespaces
Page
Discussion
English
Views
Read
Edit
View history
More
Search
Dig in!
Noisebridge
- Status: MOVED
- Donate
- ABOUT
- Accessibility
- Vision
- Blog
Manual
MANUAL
Visitors
Participation
Community Standards
Channels
Operations
Events
EVENTS
Guilds
GUILDS
- Meta
- Electronics
- Fabrication
- Games
- Music
- Library
- Neuro
- Philosophy
- Funding
- Art
- Crypto
- Documentation/Wiki
Wiki
Recent Changes
Random Page
Help
Categories
(Edit)
Tools
What links here
Related changes
Special pages
Page information