Editing Moving/2017 Mission
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 24: | Line 24: | ||
* Power: 9 good (checked breaker panel) | * Power: 9 good (checked breaker panel) | ||
* Connectivity: Server Closet, Rack, wired patch panels, CAT5 spaghetti throughout due to previous tenents | * Connectivity: Server Closet, Rack, wired patch panels, CAT5 spaghetti throughout due to previous tenents | ||
* | * Accessibility: ADA + Freight elevator through neighboring building | ||
Link Me to photos: [http://www.flickr.com/photos/milohholim/sets/72157619567460316/] | Link Me to photos: [http://www.flickr.com/photos/milohholim/sets/72157619567460316/] | ||
Line 31: | Line 31: | ||
Double pane windows, no central air or heat -- good view of downtown.. the space would require much less bring-up than others, with the exception of removing some partitioned areas to open it up a bit. | Double pane windows, no central air or heat -- good view of downtown.. the space would require much less bring-up than others, with the exception of removing some partitioned areas to open it up a bit. | ||