Moving/2169 Mission: Difference between revisions
Jump to navigation
Jump to search
(New page: === Features === * 12ft ceilings * 5600sf quoted * 3500lb freight elevator * three stairwells plus front fire escape * third floor of 3, 8 skylights, full floor * no PGE gas lines in bldg ...) |
|||
Line 4: | Line 4: | ||
* 3500lb freight elevator | * 3500lb freight elevator | ||
* three stairwells plus front fire escape | * three stairwells plus front fire escape | ||
* third floor of 3, 8 skylights, full floor | * third floor of 3, 8 skylights (currently painted over), full floor | ||
* no PGE gas lines in bldg | * no PGE gas lines in bldg | ||
* concrete pillars with apparently wood frame floors (floor finished in mix of wood, linoleum, and tile) | * concrete pillars with apparently wood frame floors (floor finished in mix of wood, linoleum, and tile) |
Revision as of 17:09, 10 July 2009
Features
- 12ft ceilings
- 5600sf quoted
- 3500lb freight elevator
- three stairwells plus front fire escape
- third floor of 3, 8 skylights (currently painted over), full floor
- no PGE gas lines in bldg
- concrete pillars with apparently wood frame floors (floor finished in mix of wood, linoleum, and tile)
- former sweatshop, tons of electrical distribution
- $3600/mo 3yr lease quoted
- available now, would like us to move in 2009-08-01 or 2009-08-15
- family owned, we talked to the son (seems like a nice guy with his shit together), they live in SF
- windows on Mission and on rear
- two tiny bathrooms
- many 8ft walls separating space are easily removed as we desire
- a few small full-height rooms, we would want to build out to our spec
- roof appears to be in reasonable shape
- roof access is through the space, available for antennas / repairs but not for general access (no roof deck or hottub)