Moving/2169 Mission/challenges: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
(init page ~~~~)
 
No edit summary
Line 1: Line 1:
= Overview =
= Overview =
There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.
There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.
* Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?


=Move in cost=
=Move in cost=


=Build-out cost=
=Build-out cost=

Revision as of 15:32, 20 July 2009

Overview

There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.

  • Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?

Move in cost

Build-out cost