Moving/2169 Mission/challenges

From Noisebridge
Revision as of 15:32, 20 July 2009 by Matt (talk | contribs)
Jump to navigation Jump to search

Overview

There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.

  • Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?

Move in cost

Build-out cost