Moving/2169 Mission/challenges

From Noisebridge
< Moving | 2169 Mission
Revision as of 19:11, 20 July 2009 by Adi (Talk | contribs)

Jump to: navigation, search


There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.

  • Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
  • is 2169 accessible to wheelchair users?
  • is the vermin problem (due to the greengrocery downstairs) large or small?

Move in cost

Build-out cost

Personal tools