Moving/2169 Mission/challenges

From Noisebridge
Revision as of 19:11, 20 July 2009 by Adi (talk | contribs) (→‎Overview)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Overview

There has been much discussion on the mailing list about various issues faced with moving to 2169 Mission. Please list the various issues you think that Noisebridge should address.

  • Lack of published budget showing we can afford this space with our existing run rate AND afford the required/desired upgrades?
  • is 2169 accessible to wheelchair users?
  • is the vermin problem (due to the greengrocery downstairs) large or small?

Move in cost

Build-out cost