Editing SCADA

Jump to navigation Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 64: Line 64:
Anything involving the elevator panel needs to go through the city.  To find out who can answer your question, talk to the TSD:
Anything involving the elevator panel needs to go through the city.  To find out who can answer your question, talk to the TSD:


http://www.sfgov.org/site/uploadedfiles/dbi/Web.DBIDirectory.pdf
  http://www.sfgov.org/site/uploadedfiles/dbi/Web.DBIDirectory.pdf


The elevator conveyance ID is #<code>026140</code>.  Although Henry Ho has agreed in writing to our intent to modify the elevator, the city and state both need to approve the changes.  If we pay anyone to fix the elevator it's generally quite expensive and requires specially certified labor, so that's plan B.  Plan A is to do it ourselves.
The elevator conveyance ID is #<code>026140</code>.  Although Henry Ho has agreed in writing to our intent to modify the elevator, the city and state both need to approve the changes.  If we pay anyone to fix the elevator it's generally quite expensive and requires specially certified labor, so that's plan B.  Plan A is to do it ourselves.
Line 80: Line 80:
ASME A.17 itself references several other standards such as IEEE and Bell System standards.
ASME A.17 itself references several other standards such as IEEE and Bell System standards.


Once the work is done, this triggers a modernization inspection because the elevator has been significantly changed as part of work done to the building.  This will probably be done by either Jennifer Stafford, the acting senior engineer at California [http://www.dir.ca.gov/dosh/AROffices.htm DOSH ERT]'s Oakland office, or Deborah Tudor, the principal engineer in the San Jose district office.
Once the work is done, this triggers a modernization inspection because the elevator has been significantly changed as part of work done to the building.  This will probably be done by either Jennifer Stafford, the acting senior engineer at California [[http://www.dir.ca.gov/dosh/AROffices.htm DOSH ERT]]'s Oakland office, or Deborah Tudor, the principal engineer in the San Jose district office.


A modernization inspection will require that we file a document called a "letter of intent" with DOSH ERT:
A modernization inspection will require that we file a document called a "letter of intent" with DOSH ERT:
Please note that all contributions to Noisebridge are considered to be released under the Creative Commons Attribution-NonCommercial-ShareAlike (see Noisebridge:Copyrights for details). If you do not want your writing to be edited mercilessly and redistributed at will, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. Do not submit copyrighted work without permission!

To protect the wiki against automated edit spam, we kindly ask you to solve the following CAPTCHA:

Cancel Editing help (opens in new window)