SecWG: Difference between revisions
Jump to navigation
Jump to search
(→Meetings: more Conclusions, more links) |
m (→Meetings) |
||
Line 14: | Line 14: | ||
* the RFID reader we have now -- does it work? We're not sure. | * the RFID reader we have now -- does it work? We're not sure. | ||
* keeping [[Docents]] running is at least "Very Hard" and may be "Impossible". Let's work on technological solutions to social problems first. | * keeping [[Docents]] running is at least "Very Hard" and may be "Impossible". Let's work on technological solutions to social problems first. | ||
* Access control to the space != solving problems related to theft | * Access control to the space != solving problems related to protecting property (theft, vandalism, etc) within the space. Totally separate conversation that will be had in the future. | ||
Revision as of 13:44, 12 May 2014
Meetings
Thursday, May 1st, 7pm at Noisebridge. @crw took a chat log on Slack (see SecWG_Meeting_Notes_2014_05_01). Remote attendance was provided via Mumble.
Conclusions: Narrowing scope of SecWG down to access control and possibly spinning up Docents again.
Impromptu virtual meeting on Thursday, May 8th, via mailing list, IRC, and Slack/#security-wg resulted in some nice AccessControlModeling and several mailing list threads.
Conclusions:
- Let's install an RFID reader at the top of the stairs. Debate continues over whether to leave front gate setup alone, or to remove the keypad for entry.
- Members and Associate Members would be entitled to an RFID entry badge. Debate over whether to allow all types of RFID cards so that ppl won't need a separate physical item (they can use their Clipper card).
- the RFID reader we have now -- does it work? We're not sure.
- keeping Docents running is at least "Very Hard" and may be "Impossible". Let's work on technological solutions to social problems first.
- Access control to the space != solving problems related to protecting property (theft, vandalism, etc) within the space. Totally separate conversation that will be had in the future.
Agenda
Fill in the _______
Peoples
Projects
- Alpha
- Beta
- Etc...