Space10: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
 
Line 8: Line 8:
* price, then obtain, materials  
* price, then obtain, materials  
* make the pieces
* make the pieces
* poly varnish (and/or stain/paint?) the pieces
* finish: spar urethane for outdoor protection. poly varnish (and/or stain/paint?) the pieces
* assembly
* assembly
* fill with plants!!
* fill with plants!!

Latest revision as of 13:54, 23 December 2021

Proposed Space10 Growroom project for the front patio at 272 Capp!

Communication channel: #fabrication on slack

Plan[edit]

  • determine if it fits in the space and where it will go (~9 feet across)
  • get maslow cnc working
  • price, then obtain, materials
  • make the pieces
  • finish: spar urethane for outdoor protection. poly varnish (and/or stain/paint?) the pieces
  • assembly
  • fill with plants!!

https://github.com/space10-community/the-growroom

Crew[edit]

  • gaardn (for revitalizing the Maslow CNC, testing fit tolerance cuts, teaching software, assembly)
  • jd ?
  • lizzard (for stain, paint, assembly, and planting stage)