While I do have some opinions on this (and other issues), I&#39;m more interested in the best outcome for the group, and what the consensus decides.<br><br><div class="gmail_quote">On Fri, Jul 17, 2009 at 2:28 PM, Christie Dudley <span dir="ltr">&lt;<a href="mailto:longobord@gmail.com">longobord@gmail.com</a>&gt;</span> wrote:<br>
<blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
That being said, I don&#39;t agree with aestetix&#39;s assessment of the<br>
situation.  But we&#39;re all entitled to our own opinions.  I do wish you<br>
hadn&#39;t resigned your membership, as I consider you to be a valuable<br>
contributor, but I understand the need to stay true to ones self.<br>
<br>
Christie<br>
<br>
---<br>
 Disrupting paradigms since 1967<br>
<div class="im"><br>
<br>
<br>
On Fri, Jul 17, 2009 at 12:12 PM, Geoff Schmidt&lt;<a href="mailto:geoff@geoffschmidt.com">geoff@geoffschmidt.com</a>&gt; wrote:<br>
</div><div><div></div><div class="h5">&gt; On Tuesday, some members asked me to set up a showing of 224 12th,<br>
&gt; the .65/ft office-ish space in soma. I tried to get something together<br>
&gt; for Thursday but there were problems coordinating with TRI, the<br>
&gt; landlord&#39;s broker. So it&#39;ll probably be Monday or Tuesday of next<br>
&gt; week, circa 7pm. If you want to see the space and can&#39;t make it, reply<br>
&gt; offlist with your constraints.<br>
&gt;<br>
&gt; To set expectations, 224 12th should be in better shape (walls go to<br>
&gt; the ceiling, floors in decent condition, etc) but I suspect it&#39;ll feel<br>
&gt; like midlist office space instead of a blank h4x0r canvas. It&#39;s also a<br>
&gt; bit smaller, 80% of the size. On the other hand, the buildout<br>
&gt; contemplated at 2169 Mission is easily $50k+ if done in any way<br>
&gt; approaching legal[*], and lots of time. If 224 12th is already divided<br>
&gt; in an acceptable way it might be worth considering.<br>
&gt;<br>
&gt; To be clear: I am setting this up because I was asked to do so. I&#39;m<br>
&gt; not a member and am not advocating for any direction by the group; I<br>
&gt; just want to make what/who I know available to such Noisebridgers as<br>
&gt; may want it.<br>
&gt;<br>
&gt; geoff<br>
&gt;<br>
&gt; [*] Some notes here: If you build stuff without permits, the fine is 9<br>
&gt; (IIRC) times what the permit fee would have been, often reduced to 3<br>
&gt; times the permit fee on appeal. The permit fee&#39;s a few thousand<br>
&gt; dollars, but that&#39;s not the bad part. The bad part is that the city<br>
&gt; can make you tear everything out and rebuild it, so that they can<br>
&gt; inspect the interiors of the walls before the drywall goes on and such<br>
&gt; things. When work is done with permits, it needs to be done by<br>
&gt; licensed, insured, bonded contractors, with a few exceptions, and must<br>
&gt; be to code. It is not feasible for amateurs to get licenses, but we<br>
&gt; have friends with licenses. Clearly work is done all the time without<br>
&gt; permits, but it is a risk in a space open to the public for events.<br>
&gt; _______________________________________________<br>
&gt; Noisebridge-discuss mailing list<br>
&gt; <a href="mailto:Noisebridge-discuss@lists.noisebridge.net">Noisebridge-discuss@lists.noisebridge.net</a><br>
&gt; <a href="https://www.noisebridge.net/mailman/listinfo/noisebridge-discuss" target="_blank">https://www.noisebridge.net/mailman/listinfo/noisebridge-discuss</a><br>
&gt;<br>
_______________________________________________<br>
Noisebridge-discuss mailing list<br>
<a href="mailto:Noisebridge-discuss@lists.noisebridge.net">Noisebridge-discuss@lists.noisebridge.net</a><br>
<a href="https://www.noisebridge.net/mailman/listinfo/noisebridge-discuss" target="_blank">https://www.noisebridge.net/mailman/listinfo/noisebridge-discuss</a><br>
</div></div></blockquote></div><br>