<div>Jim, are there already lighting circuits connected in the 6&#39; wall boxes the Turing CAVE? Sorry if I&#39;m not up to speed with this -- it will be easy to fix up lights for Turing if so!  There&#39;s a light switch on light flex sitting on a table in there already...</div>
<div><br></div>Anyone working on electical:  please follow the conventions jim set up so everyone is on the same page ---&gt;  <div>     receptacles on black circuits</div><div>     lights/fans on red circuits</div><div><br>
</div><div>I couldn&#39;t find the original references to this but there&#39;s the RFC re: the bathroom buildout </div><div><br></div><div>Noisebridge electrical RFC </div><div><div><a href="https://www.noisebridge.net/pipermail/build/2010-August/000770.html">https://www.noisebridge.net/pipermail/build/2010-August/000770.html</a></div>
<div><br></div><div>and reference information on panel location and wiring info:</div><div><div><a href="https://www.noisebridge.net/pipermail/build/2010-August/000772.html">https://www.noisebridge.net/pipermail/build/2010-August/000772.html</a></div>
<div><br></div><div><br></div><div>-rma</div><div><br></div><div>(henceforth referring to the noisebridge rooms as CAVEs) </div></div></div>