Elevator
Jump to navigation
Jump to search
Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Resources | Events | Projects | WGs | 5MoF | Meetings | Donate | V · T · E |
272 Capp St. | Layout | Parking | Fence | Access | Patio | Entrance | Front | Hackitorium | Stage | Lockers | Stairs | Upstairs | Classrooms | Exits | Roll up door | Bathrooms | Network | Roof | Audio | AV | Construction | Electrical | Print Shop | Elevator | Back hall | Back patio | Fire escape | Plants | Sustenance | Housekeeping | V · T · E |
You are standing at the location of a future elevator construction project proposed to be built at the Front leading Upstairs. |
272 Capp St. Elevator Construction Project[edit | edit source]
Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.
- Details will go here as they develop.
- It fits into the larger 272 buildout plan.
Proposed Locations[edit | edit source]
- In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen
Proposed Elevator Types[edit | edit source]
Hercules II[edit | edit source]
A small lift capable of taking wheelchairs and equipment between floors.
AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000
This is what the Hercules II elevator could look like:
UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit |