SpringClean2016
Tasks[edit]
Dump Run Staging: All general and construction debris should be collected for later loading for transport to the dump.
Ewaste Staging: Gather current Ewaste and add additional Ewaste from hack shelves and project shelves. Collect into easy to move bins and bags for later transport to an Ewaste recycler.
Hazards Staging: Any hazardous materials that are no longer needed or of little use should be put into crates and stacked for removal to the proper facility.
Dust Shelves: Brush dust off any high surfaces and shelves for later collection via sweeping.
Wipe down Tables and Chairs: Clear tables and chairs and wipe/scrub down with clean wet rags.
Sweep/Mop: Move furniture and sweep and mop the space. This should come after wiping down the tables.
Entryway sweeping: Sweep out stairway and collect any accumulated trash. Also sweep elevator carriage.
Tool collection and reset: Phase 1. Carefully walk through each room in the space and collect any misplaced tools. Look though any bins / crates that are holding tools in out of the way locations, where they wouldn't be found. If the location of tools is not known, collect into a crate for later sorting. Phase 2. Look through tool bins / shelves in electronics area, shop, and sewing area and sort any tools that appear to be in the wrong places, or make better places for them.
Sewing area purge: Remove any less useful scraps, and abandoned projects (Tags >2 months old). Add to Dump Run staging pile.
Shop purge: Remove less useful scrap materials, keeping only the better scraps that can fit in the shop scrap areas. Add to dump run staging pile.
Purge books: Books that are not to be part of the Noisebridge Library collection should be staged for Dump Run, or offered for free on Mission street.
Locker Purge: Lockers shall be opened and purged according to previously established protocols
Project Shelf purge: Abandoned projects (Tags >2 months old) will be untagged and moved to hack shelves or Ewaste staging depending on judgement of person preforming purge.
Window Cleaning: Windows to be wiped clean and dryed. To the extent that the person perfuming the task feels safe doing so.
Bathroom Cleaning: Empty trash cans. Wipe down walls. Scrub fixtures. Sweep and Mop Floors.
Turing Paint Job: Scrub off paint splatters on windows/doors. Mask off equipment. Touch up Ceiling art (See Jarrod for details). Mask and paint walls.
Project Shelf and Hack Shelf relocation: After/During Hack and Project shelf purge. Rebuild shelving in new location for project storage and move hack shelf items to current project shelf location.
Supplies required or desired[edit]
Need a faucet to hose adapter for filling mop buckets.